The scope of CCC certification for motor vehicles shall be in accordance with the requirements of the Implementing Rules for vehicles of category M, N and O (including complete vehicles and non-integrated vehicles). The certification according to the general safety standards eg GB 7258 "technical requirements for the safe operation of motor vehicles", For specific product inspection articles, please refer to the implementation rules of CNCA-C11-01: 2014 Automotive Annex 1 Type Test Projects and Standards.

1, How long does it take from the application to the receipt of the certificate?

90 days are set by law for cetification. According to experience, these sometimes take longer.

* it could result in a delay in processing:

if application documents are not complete,

if there are problems with testing in the Test Lab,

if there is a deviation in the audit.

Source: CCAP-C11-01: 2014 / A1 page 4, item 6.2

2, How often does factory audit take place?

Plant is classified after the initial audit in A, B, C, D.

A: Factory audit takes place once every 2 years.

B or C: Factory audit takes place once a year.

D: Factory audit takes place at least twice a year.

Source: CCAP-C11-01: 2014 / A1 Page 2, Point 4.2, CCAP-C11-01: 2014 / A1 Page 13, Point 10.2

3, how many audit days are there at the Inital Audit or the FU Audit?

Initial Audit: up to 10 man day per model series, depending of subparts certified

FI audit: up to 6 man day per model series

Source: CCAP-C11-01: 2014 / A1 page 9, clause 9.2.1.2,

CCAP-C11-01: 2014 / A1 page 14, item 10.3.2

4, how is the audit conducted?

Factory audit is performed according to IR CNCA-C11-01 Appendix 5

- Responsibility of quality manager: Appointment letter and service description (creation of control documents, management of change, complaint, CCC mark, CCC certificate status, etc.)

-Technical documentation: management of technical documents, control plan, product standard, product description of existing / new products, etc.

-Overview control: control of property, model and supplier of core material and core components, etc.

- Checking product compliance: running tests, final tests, etc.

Review of production process compliance: review of product structure, material and component, conformity of core production process, etc.

Product Check: Requalification Test

Change control: control of change request, etc.

Control of serious quality problems: customer complaint, recall, etc.

Source: IR CNCA-C11-01 Appendix 5

5, which application documents should be submitted to the initial audit?

  1. Application form
  2. License in copy - 会社に関する簡単な情報、製造プロセス、コア製造設備のリスト、コアテスト機器のリスト、登録商標の証明書などを含む質問表
  3. Car structure and technical parameters
  4. COP control plan
  5. Declaration: how is type, series defined
  6. Declaration: how is VIN defined
  7. Explanation: we distinguish the different types by external marking
  8. Declaration: Operating instructions in Chinese
  9. COC certificate
  10. Review
  11. Quality Manual
  12. Quality system certificates in copy
  13. Etc.

Source: CCAP-C11-01: 2014 / A1 Page 22-23 Appendix 1

6, how is Unit (technical unit) defined?

Step 1: Group car first after series defined by manufacturer

Step 2: Units are removed from the same series

It can not be defined as a unit if:

- Car types are not the same (M1 - up to 9 seater, M2 - from 10 seats, M3, N1, N2, N3, O1, O2, O3, O4), see below 8.1.1, 8.1.2, 8.1.3.

- car series is not equal

- position of the engine is not equal (front, middle, rear)

- fuel is not equal (gasoline, diesel, gas, electricity, etc. Hybrid "gasoline + electric" is considered as same unit as gasoline engine, hybrid "diesel + electric" is considered as same unit as diesel engine)

- Drive is not equal (four-wheel, non-four-wheel)

- Sum of the axis is not equal

- Etc.

Within one unit:

- Vehicle outside dimension limit: 20%, longest <= shortest x 1.2

- Limit axle position, wheelbase: 15%, longest <= shortest x 1.15

- Limit parameters (total weight, distribution of front and rear axle): 20%

- Etc.

6.1 M1

Same design platform, structure from part before B pillar similar (sedan, station wagon, convertible with hardtop, convertible with folding roof, etc.)

Limit within one unit: Engine KW: 30%, Displacement: 20%

6.2 M2, M3, N1, N2, N3

Limit value for engine KW: 50%, engine capacity: 50%

Limit within one unit: total weight: 20%

Source: IR CNCA-C11-01 Appendix 2

7. Which tests are performed according to which GB standard?

See CCAP-C11-01: 2014 / A1 page 29-45

8, List of key component and materials:

See CCAP-C11-01: 2014 / A1 page 22-23 Appendix 1 page 24-27

CCCニュース

ドイツにエンジニアリング研究開発センターを設立 ドイツにエンジニアリング研究開発センターを設立 2019-05-18 - 5月の中国ニュースサービス北京によると、16は...
都市鉄道輸送設備の実施規則が発表されました 都市鉄道輸送設備の実施規則が発表されました 2019-05-06 - 中国認証からの最近の発表によると...
中国CCC製品の試験所の事業範囲を更新しました 中国CCC製品の試験所の事業範囲を更新しました 2019-04-29 - 中国CCCのための選ばれた試験所の事業範囲...
21の新しく改訂されたGB規格がリリース 21の新しく改訂されたGB規格がリリース 2019-04-19 - 中国の国務院からの最近の報道によると、...
177の新しく改訂されたGB規格がリリース 177の新しく改訂されたGB規格がリリース 2019-04-04 - 中国の国務院からの最近の報道によると、...
ダイムラーは電気自動車を生産するために数百万ユーロを投資する ダイムラーは電気自動車を生産するために数百万ユーロを投資する 2019-03-24 - ダイムラー・グループは数百万ユーロ(約...
中国CCC自動車製品のGB規格の更新 中国CCC自動車製品のGB規格の更新 2019-03-17 - CNCAの最近の発表によると(中国国家...
テスラモデル3 - 中国市場配達式 テスラモデル3  - 中国市場配達式 2019-03-15 - 1月22、2019、モデル3中国市場納入式...
自動車レトロリフレクター製品CCAPマーク認証 自動車レトロリフレクター製品CCAPマーク認証 2019-03-12 - 中国国家代表の精神を実行するために...
オーディオおよびビデオ機器の詳細な実装規則が改訂されました オーディオおよびビデオ機器の詳細な実装規則が改訂されました 2019-03-10 - 中国品質認証センター(CQC)が規制を改正しました...

サポート

Unterstützung

あなたはあなたのペースで働きます。 ポータルを使用してプロジェクトを独立して処理することができ、個人的なサポートについても問い合わせることができます。 したがって、私たちはあなた自身のプロセスを設計する機会に献身してきました

オンライン管理

オンライン管理

経験豊富な従業員のノウハウやサポートを忘れることなく、独自の認証プロセスを実行する機会を提供します。 オンラインシステムはさまざまな認定資格のために設計されており、FAQリスト、既製のフォームや表、従業員とのオープンな質問を明確にするためのモジュールを提供しています。

証明書を変更する

証明書を変更する

私たちの短期間では、ビジネスライフの変化は常に伴奏です。 それは非常に迅速に撃退することができます。 これには内外の理由があります。 CSは変更時の適合性の概要を示します。

協力

協力

私たちは限られた時間と財務能力しか持たず、包括的なサービスを提供したいと考えています。協力は関連組織間でのみ意味があります。 これらは信頼性の高い構造と優れた対人調和を備えています。

ページのトップへ