The scope of CCC certification for motor vehicles shall be in accordance with the requirements of the Implementing Rules for vehicles of category M, N and O (including complete vehicles and non-integrated vehicles). The certification according to the general safety standards eg GB 7258 "technical requirements for the safe operation of motor vehicles", For specific product inspection articles, please refer to the implementation rules of CNCA-C11-01: 2014 Automotive Annex 1 Type Test Projects and Standards.

1, How long does it take from the application to the receipt of the certificate?

90 days are set by law for cetification. According to experience, these sometimes take longer.

* it could result in a delay in processing:

if application documents are not complete,

if there are problems with testing in the Test Lab,

if there is a deviation in the audit.

Source: CCAP-C11-01: 2014 / A1 page 4, item 6.2

2, How often does factory audit take place?

Plant is classified after the initial audit in A, B, C, D.

A: Factory audit takes place once every 2 years.

B or C: Factory audit takes place once a year.

D: Factory audit takes place at least twice a year.

Source: CCAP-C11-01: 2014 / A1 Page 2, Point 4.2, CCAP-C11-01: 2014 / A1 Page 13, Point 10.2

3, how many audit days are there at the Inital Audit or the FU Audit?

Initial Audit: up to 10 man day per model series, depending of subparts certified

FI audit: up to 6 man day per model series

Source: CCAP-C11-01: 2014 / A1 page 9, clause 9.2.1.2,

CCAP-C11-01: 2014 / A1 page 14, item 10.3.2

4, how is the audit conducted?

Factory audit is performed according to IR CNCA-C11-01 Appendix 5

- Responsibility of quality manager: Appointment letter and service description (creation of control documents, management of change, complaint, CCC mark, CCC certificate status, etc.)

-Technical documentation: management of technical documents, control plan, product standard, product description of existing / new products, etc.

-Overview control: control of property, model and supplier of core material and core components, etc.

- Checking product compliance: running tests, final tests, etc.

Review of production process compliance: review of product structure, material and component, conformity of core production process, etc.

Product Check: Requalification Test

Change control: control of change request, etc.

Control of serious quality problems: customer complaint, recall, etc.

Source: IR CNCA-C11-01 Appendix 5

5, which application documents should be submitted to the initial audit?

  1. Application form
  2. License in copy - 会社に関する簡単な情報、製造プロセス、コア製造設備のリスト、コアテスト機器のリスト、登録商標の証明書などを含む質問表
  3. Car structure and technical parameters
  4. COP control plan
  5. Declaration: how is type, series defined
  6. Declaration: how is VIN defined
  7. Explanation: we distinguish the different types by external marking
  8. Declaration: Operating instructions in Chinese
  9. COC certificate
  10. Review
  11. Quality Manual
  12. Quality system certificates in copy
  13. Etc.

Source: CCAP-C11-01: 2014 / A1 Page 22-23 Appendix 1

6, how is Unit (technical unit) defined?

Step 1: Group car first after series defined by manufacturer

Step 2: Units are removed from the same series

It can not be defined as a unit if:

- Car types are not the same (M1 - up to 9 seater, M2 - from 10 seats, M3, N1, N2, N3, O1, O2, O3, O4), see below 8.1.1, 8.1.2, 8.1.3.

- car series is not equal

- position of the engine is not equal (front, middle, rear)

- fuel is not equal (gasoline, diesel, gas, electricity, etc. Hybrid "gasoline + electric" is considered as same unit as gasoline engine, hybrid "diesel + electric" is considered as same unit as diesel engine)

- Drive is not equal (four-wheel, non-four-wheel)

- Sum of the axis is not equal

- Etc.

Within one unit:

- Vehicle outside dimension limit: 20%, longest <= shortest x 1.2

- Limit axle position, wheelbase: 15%, longest <= shortest x 1.15

- Limit parameters (total weight, distribution of front and rear axle): 20%

- Etc.

6.1 M1

Same design platform, structure from part before B pillar similar (sedan, station wagon, convertible with hardtop, convertible with folding roof, etc.)

Limit within one unit: Engine KW: 30%, Displacement: 20%

6.2 M2, M3, N1, N2, N3

Limit value for engine KW: 50%, engine capacity: 50%

Limit within one unit: total weight: 20%

Source: IR CNCA-C11-01 Appendix 2

7. Which tests are performed according to which GB standard?

See CCAP-C11-01: 2014 / A1 page 29-45

8, List of key component and materials:

See CCAP-C11-01: 2014 / A1 page 22-23 Appendix 1 page 24-27

CCCニュース

中国における試験所の事業範囲の更新 中国における試験所の事業範囲の更新 2019-01-04 - 最近の発表によると、以下の事業は...
改訂中の46 GB規格 改訂中の46 GB規格 2018-12-30 - 最近の標準化からリリースされたプレスによると...
CCC製品の認定試験機関の事業範囲が更新されました CCC製品の認定試験機関の事業範囲が更新されました 2018-12-26 - CNCAの最近の発表によると、事業範囲は...
中国の2019ホリデースケジュールが発表されました 中国の2019ホリデースケジュールが発表されました 2018-12-23 - 最近のゼネラルオフィスの発表によると...
中国CCCカタログ更新 中国CCCカタログ更新 2018-12-17 - SAMR( "State ...")による最近の共同発表によると
消火製品のための新しい中国CCC認証機関 消火製品のための新しい中国CCC認証機関 2018-12-16 - CNCAの現在の発表によると( "証明書...
27 New GB Standardsリリース 27 New GB Standardsリリース 2018-11-26 - 最近の標準化からリリースされたプレスによると...
7 New GB Standardsリリース 7 New GB Standardsリリース 2018-11-03 - 最近の国務院からの報道によると...
中国強制認証(CCC)システム改革 中国強制認証(CCC)システム改革 2018-10-25 - 10月の22、2018、Li Keqiang首相は、
CCC製品の新しい認定試験所 2018-10-16 - CNCA(「中国の認証および認定管理」)...

カスタマーサポート

Unterstützung

あなたはあなたのペースで働きます。 ポータルを使用してプロジェクトを独立して処理することができ、個人的なサポートについても問い合わせることができます。 したがって、私たちはあなた自身のプロセスを設計する機会に献身してきました

オンライン管理

オンライン管理

経験豊富な従業員のノウハウやサポートを忘れることなく、独自の認証プロセスを実行する機会を提供します。 オンラインシステムはさまざまな認定資格のために設計されており、FAQリスト、既製のフォームや表、従業員とのオープンな質問を明確にするためのモジュールを提供しています。

証明書を変更する

証明書を変更する

私たちの短期間では、ビジネスライフの変化は常に伴奏です。 それは非常に迅速に撃退することができます。 これには内外の理由があります。 CSは変更時の適合性の概要を示します。

協力

協力

私たちは限られた時間と財務能力しか持たず、包括的なサービスを提供したいと考えています。協力は関連組織間でのみ意味があります。 これらは信頼性の高い構造と優れた対人調和を備えています。

ページのトップへ